How to Specify Venetian Plaster: A Plain Guide for Architects and Designers

This is a plain guide for architects, interior designers and specification writers who want Venetian plaster on a project and want it built the way it was drawn. It covers what to decide, what to write down and what to check before tender. Always follow the chosen manufacturer’s technical data sheet; where we give an example below, it comes from the data sheets of lime products we use.

1. Name the material type

“Venetian plaster” is used for very different products. Say which one you mean:

  • Lime based Venetian plaster. Slaked lime putty with marble powder. Breathable and mineral. Includes polished stucco (often called Grassello or stucco lucido) and Marmorino.
  • Acrylic or synthetic Venetian plaster. Resin based products with a similar look.
  • Venetian effect paint. A paint system, not a plaster.

Name a product, or the type plus “or approved equivalent”, so tender prices compare like with like.

2. Name the finish

  • Polished (high sheen). Finest marble grade, laid thin and burnished hard.
  • Marmorino (matt to satin). Coarser marble grain with a stone texture.
  • Textured or stone effect, such as travertine.
  • Metallic.

Refer to an approved sample by reference number in the spec. Words like “high gloss” mean different things to different people. A signed off sample does not.

3. Substrate and primer

Venetian plaster shows every flaw underneath it. Specify the flatness tolerance for the backing surface and who is responsible for achieving it. Lime plasters need a suitable primer or base coat. As an example, the lime polished plaster and Marmorino data sheets we work from both call for a primer or levelling base before the first coat. On plasterboard, joints and screw heads need attention so they do not show through.

4. Coats and drying time

Write the minimum number of coats into the spec and allow for drying time in the programme. As an example from manufacturer data we use: a lime polished plaster is laid in three coats, with no more than two in the first twelve hours, and a Marmorino needs two or more coats with the first left to dry for at least four hours. In practice a polished wall needs more than one day on site.

5. Sealing and protection

Say whether the finish is waxed, where, and with what. Wax adds water resistance and sheen and makes cleaning easier. For high touch areas like corridors and bar fronts, waxing is usually worth specifying. State how finished surfaces will be protected from following trades, and by whom.

6. Wet areas and exteriors

Bathrooms, splash zones and showers need their own specification. Do not assume a product for dry walls will work in a shower. For exterior use, check the manufacturer’s conditions closely; some lime finishes are only rated for exterior use over a specific base coat.

7. Site conditions

Lime plasters have working temperature limits, typically above 5°C. Include heating and ventilation in the preliminaries if the work falls in winter, and keep dusty trades out of the area during final coats.

8. Approval and handover

  • A sample panel approved before work starts.
  • A first area completed and approved before the rest.
  • Maintenance guidance at handover.

Checklist before tender

  • Material type and product, or approved equivalent
  • Finish, with approved sample reference
  • Substrate standard and primer
  • Minimum coats
  • Sealing and wax
  • Wet area or exterior details
  • Temperature and site conditions
  • Protection and approval stages

Talk to a specialist

Finest Plastering Limited is a specialist Venetian plaster subcontractor. We are happy to review a specification, make samples and price from drawings. See commercial Venetian plaster or send us your drawings.

Start a project

Tell us about the walls.

Call WhatsApp Start a project