01About Us 02Case Studies 03Finishes 04Gallery 05Training 06Journal 07Contact 08Start a project
Everyone notices the walls first

Hand-applied Italian lime, trowel-burnished, made to last. Specified by architects. Proven on heritage and commercial projects.

02 Why Finest Plastering

Why us, in five lines

IWe do this and nothing else

No skimming, no general plastering, no subcontracting. Every wall is applied and burnished by hand by people who do it every day.

IIGenuine Italian lime

Supplied by Zavorè, who import it from Italy. We know exactly what is in the tub, and we would not use anything else.

IIISpecified by architects

We have worked on a Grade II* listed building, which is the highest listing grade there is.

IVThree bespoke samples

Made for your wall before you commit to anything. You choose the finish in your hand, not from a photograph.

VA fixed written price

Once it is signed, it does not move.

Ask for your three samplesBefore you decide anything
03 Proof

Our work, on site

Real projects, photographed where they were built.

Lime finish to a listed-building specification Lime plaster, close detail
Heritage, hotel conversion

Donington Hall

Grade II* listed and converted into a hotel for MotorSport Vision. Lime throughout, applied to the listed-building specification.

Media wall in dark marble effect with gold veining Dark marble effect with hand-drawn gold veining
Residential, media wall

A marble wall with no marble in it

A media wall in dark marble effect with hand-drawn gold veining. It turns the corner and runs behind the shelving without a seam.

Nightclub feature wall in black and bronze textured plaster Black and bronze textured plaster, close detail
Hospitality, nightclub walls and pillars

Black and bronze, worked by hand

Black and bronze plaster on the walls and pillars of a nightclub that was trading the next night.

04 The process

Start to finish, in five steps

Every job runs in the same order, so you know where you are at every point.

Day one

We look

A call, or a visit to the wall. What it is made of and how the room is used decide the system, and we say which before anything is priced.

Week one

The board

Made in your finish and colour, left on your wall for you to live with. You sign it off or we make another. Nothing moves until you do.

Week two

The quotation

Preparation, materials, labour and protection, each itemised in writing. No day rate hiding anything. Agreed is agreed.

On site

The coats

Protection first, dust kept down, then each coat built and burnished to match the board. The site is left clean every evening.

Handover

Done

A walk round together, a note on aftercare, and a wall that keeps hardening for years. We are still on the phone afterwards.

Book a free online consultationA free call and a sample panel
05 The finishes

The six finishes we work in

Polished plaster

Aged lime and marble flour, worked until it reflects. The glassiest of the six, and the one people mean by Venetian plaster.

Marmorino

Marble aggregate with a bit more grain, matt or softly burnished. Kinder across a big wall, and it wears in rather than out.

Microcement

Two millimetres thick, seamless and sealed. Goes over tiles, takes a floor, and does not mind a shower.

Tadelakt

The Moroccan one: lime, a polishing stone and olive-oil soap. One continuous surface, which is why it lives in wet rooms.

Limewash

Brushed, not trowelled. Chalky, cloudy and almost without sheen. Four walls of it make a room feel quiet.

Liquid metal

Actual metal in the finish, which tarnishes and patinates like metal does. Bronze, brass, copper and iron.

Message us on WhatsAppPhoto of the wall, and we will recommend one
06 Plymouth

Finest Plastering in Plymouth

We work in Plymouth and the South Hams for whole rooms and complete schemes. The city has a Georgian quarter around Stonehouse and the Hoe and the converted naval buildings of Royal William Yard, and on its doorstep Salcombe, Dartmouth, Kingsbridge and the Yealm, where the houses are either very old or very new and the owners are particular.

Royal William Yard and the Georgian stock are lime, listed, and we work them in lime. The South Hams houses are the interesting ones: a modern glass house above the estuary wants polished plaster or microcement, while a cob and stone cottage wants limewash and a soft Marmorino. Coastal air rewards a properly sealed finish.

Everything about how we work — the samples, the fixed price, the six finishes — is on our main Venetian plastering page. This page is about Plymouth.

Barbican The Hoe Mannamead Plympton Plymstock Mutley Yelverton Newton Ferrers

We cover the whole of Plymouth and the towns around it. If your address is not listed, ask anyway.

Get a fixed written priceAgreed in writing, then left alone
07 Questions

Things people want to know

Are you local to Plymouth?
Yes. We work across Plymouth, from Barbican out to Yelverton and Newton Ferrers, and a job here is planned as a single visit rather than stretched across weeks.
Do you work in the South Hams as well as Plymouth?
Yes. Salcombe, Dartmouth, Kingsbridge and the Yealm, usually as a whole room or a complete scheme, planned as a single block with the dates fixed in writing.
What is the first step?
A panel on your wall in the real finish and colour. You live with it, then you sign it off. Nothing is ordered or priced until you have.
Is the quotation fixed?
Yes. Every part of the job is on its own line in writing before we begin, and the total does not move once agreed.
How many days does it take?
One feature wall is normally three to five days, with curing time between coats. Larger work is planned as a single block and the programme is written down first.
How long does lime plaster last?
Decades. It keeps hardening as it ages rather than wearing out, and it does not chip, peel or date the way paint does.
Do you take commercial work?
Yes. Hotels, bars, restaurants and offices, usually worked around trading hours so the room is back in use the next day.
Call usNot covered above?
Start a project

Tell us about the walls.

A picture and a measurement is all we need to start. Next steps within a working day.

Call WhatsApp Start a project