That is the UK range for a microcement bathroom, installed. Most contractors also have a minimum charge of £3,200 to £5,000, because a small room takes almost as long as a big one.
Everything below explains where the number comes from and what moves it, so you can tell whether a quote you have been given is fair.
We put the figure at the top because nobody else does. Search for this and Google currently shows a Reddit thread and a Mumsnet thread above most of the trade, which tells you how rare a straight answer is.
Every quotation is fixed in writing before we start, itemised into preparation, materials, labour and protection. The number does not move once it is signed.
A plain microcement floor in a living room is usually £85 to £120 per square metre. A bathroom is £120 to £180. The difference is not the microcement, it is everything underneath and around it.
A wet room has to be waterproofed properly before anything decorative goes on. That is a separate system, separately installed.
A floor is a rectangle. A bathroom is a basin, a toilet, a bath, a tray, a window reveal and a dozen internal corners, every one worked by hand.
A shower floor needs a different finish from a wall. That is another layer and another decision.
This is the part that surprises people, and it is the reason for the minimum charge.
A 4m² cloakroom and a 40m² kitchen floor need almost the same setup. The same protection goes down, the same primer, the same number of return visits while each layer cures. Microcement is five to seven layers over four to seven days, and you cannot compress that however small the room is.
So the labour barely changes while the area collapses. A cloakroom can work out at double the per-square-metre rate of a big open floor. A quote that looks expensive is often just a small room being priced honestly.
Materials are about £40 to £50 per square metre. The rest is labour: primer, fibreglass mesh through the base so it cannot crack along a joint, two base coats, two trowelled finish coats, sanding between, then two or three coats of sealer.
Between most of those is a wait. Anyone quoting two days is leaving layers out.
Ask for these in writing. A quote without them is not comparable to one with them.
That last one catches people out. An estimate can move. A fixed written price cannot.
Send a photograph of the room, rough measurements and your postcode. That is enough for a realistic range within one working day.
Nothing is agreed until you have seen a sample panel made in your chosen finish and colour, and a fixed written price. More on microcement and on microcement bathrooms.
If you need any help, feel free to get in touch. We are happy to answer anything about finishes, timings or price.
Message on WhatsApp